SRS Labs manual SR560 OFFSET ADJUSTMENT PROCEDURE, Battery Replacement, Fuse Replacement

Models: SR560

1 46
Download 46 pages 64 Kb
Page 22
Image 22

CALIBRATION AND REPAIR

SR560 OFFSET ADJUSTMENT PROCEDURE

Required equipment: Digital volt meter Oscilloscope

4 BNC cables

1 BNC tee Function generator Small slotted screwdriver Phillips screwdriver

Remove the bottom cover of SR560 to expose the component side of pc board.

1.Turn off the SR560. Hold down the "Reset" button, and turn the unit back on (this sets the unit back to the default settings).

2.Using a Digital Volt Meter, adjust the front panel offset pot (located between "A'' and "B" input BNC's on front panel) to read zero volts between pin 14 of U407 and ground (output BNC shield). Do not use the chassis as ground.

There are 4 potentiometers located on the bottom right side of the pc board (Viewed from the component side, with front panel facing forward). These are:

P101 = low gain CMRR adjust

P102 = high gain CMRR adjust

P103 = high gain offset adjust

P104 = low gain offset adjust

3.Set the SR560 coupling to "GND", and the gain = 50,000.

4.Connect the oscilloscope to the 50 Ohm output on the SR560.

5.Adjust P103 for zero volts on the 50 ohm output, using the oscilloscope.

6.Set the SR560 gain = 1000 and Source to "A-B''.

7.Set the function generator to square wave, Freq = 1 KHz, amplitude = 500mV pp.

8.Using a BNC tee, and 3 BNC cables, put the square wave into channels A and B.

9.Set the SR560 coupling to "DC".

10.Adjust P102 to null the square wave on the oscilloscope.

11.Set the coupling to "GND" and gain = 50,000

12.Readjust P103 for zero volts on the oscilloscope.

13.Set SR560 gain = 50 and coupling to "DC".

14.Set the oscilloscope to AC coupling.

15.Using the digital volt meter, measure the voltage from pin 6 of U105 to ground (output BNC shield).

16.Adjust P104 for zero volts on the meter.

17.Adjust P101 to null the square wave on the oscilloscope.

You might have to readjust P104 and P101 several times. The end result should be zero volts on pin 6 of U105, with the smallest amplitude square wave that you can achieve on the oscilloscope.

BATTERY REPLACEMENT

After three to five years or about 1000 charge/discharge cycles, the sealed lead- acid batteries degrade. When the battery operation time shortens, or if the unit stays very warm for more than a day after it is plugged into the line, the batteries may require replacement.

The three batteries are a standard size which are available from several different distributors. All are 12 VDC with a charge capacity of about 2.0 Amp-hours, and measure 7.02" X 1.33" X 2.38". Two of the batteries are wired in parallel to provide the high current required for the positive supply. When replacing the batteries, take care to observe the polarities!

FUSE REPLACEMENT

There are three fuses on the back panel of the instrument. The fuse located inside the power entry module will blow if the unit draws excessive line current. Replace this fuse with the value indicated for your line voltage.

18

Page 22
Image 22
SRS Labs manual SR560 OFFSET ADJUSTMENT PROCEDURE, Battery Replacement, Fuse Replacement, Calibration And Repair