Star Trac IP-S6331 manual Incremental Weight Adjustment, Installing the Shrouds

Models: IP-S6331

1 12
Download 12 pages 1.03 Mb
Page 8
Image 8

INCREMENTAL WEIGHT ADJUSTMENT:

1.Check to make sure the gap between the TOP PLATE pin and the 20mm hole of the INCREMENTAL WEIGHT plate is 3mm or less when engage.

2.If gap is greater than 3mm, loosen but do not remove the two BUTTON HEAD SCREWS (M6) using a 4MM hex key.

3.Slide the bracket up or down to create a 3mm gap.

4.Re-tighten the two BUTTON HEAD SCREWS.

GAP

SCREWS

INSTALLING THE SHROUDS:

1.Insert the SHROUDS from the top sliding downward. The SHROUDS have seven hooks for mounting.

Before the shroud can be slide down into place the SHROUD hooks need to be aligned with the corres- ponding mounting slots found on the weight frame of the equipment. Once the SHROUD hooks are in the slots, slide the SHROUD into place and verify that the top of the SHROUD is aligned with the top of the weight stack. If the SHROUD is not aligned use the palm of your hand and tap the SHROUD down until it is aligned.

2.Repeat step 1 with the inside shroud and verify alignment.

INCREMENTAL WEIGHT PLATE

Page 8

Page 8
Image 8
Star Trac IP-S6331 manual Incremental Weight Adjustment, Installing the Shrouds