Main
Page
Page
Page
Asia/Australia +86 512 8717 1919
Sales and Contracting Department
Table of Contents
Page
Page
1.1. Warnings and symbols
M This symbol indicates danger to life. Fatal or serious injury is possible if the
L This symbol indicates that serious injury is possible if the corresponding
$ This symbol indicates that a technical term is explained at this point.
F This symbol indicates that extensive damage to equipment is possible if the
& This symbol indicates information important for becoming familiar with the
1.2. Explanations and information
1.3. Legal basis
1.4. Fields of applications
1.5. Notes on usage
Page
2. Safety instructions
M These safety instructions apply to all persons within the range of action of the
2.1. For your safety
2.1.1. General
2.1.2. Assembly
2.1.3. Operation
2.1.4. Maintenance
2.2. For the operating safety of the equipment
Page
3. Transport, Assembly and Storage
M This chapter is intended for all operating personnel of the equipment.
3.1. Transport and Packing
M Please ensure adequate carrying capacity of the lifting equipment.
3.2. Assembly
M Please ensure adequate carrying capacity of the lifting equipment.
3.3. Storage
4. Assembly instructions
M These installation instructions are intended for persons with skills in electrical
L For installation work taking place at heights of over approx. 6 feet, use only
F Install the equipment so that all parts are easily accessible; this facilitates
4.1. Unpacking
F The controller must be freely accessible.
4.2. Installing the Dump Valve Sensor
4.3. Attaching the Pickup Wand
Page
4.4.1. Mounting on the processing machine
4.4.2. Mounting onto a machine hopper
L Please observe all safety regulations
4.4.3. Mounting onto mixing hoppers with lateral inlet
4.4.4. Mounting onto dosing station DT 30
4.5. Electrical connection
M The regulations of the local Electricity Board must be observed.
4.6. Installation of the optional SKW proportioning valve
& Before proceeding, review the connecting diagram included with the unit.
Page
Page
5.1. Sequence of Operation
5.2. Controller
6. Operation
M This chapter is intended for operating personnel.
F Make sure the plastic stopper has been removed from the material inlet nozzle.
Page
6.3. Setting the Conveying Time
F Do not overfill the hopper loader
& The conveying time cannot be set while the unit is in the process of conveying
& The conveying time that was last selected appears in the display.
6.4. Setting the Purge Time (optional)
& The purge time that was last selected appears
F If no line clearing valve has been installed, enter 0".
F This material should not be used again.
Page
7. Troubleshooting
M This chapter is intended for the operating personnel of the equipment.
7.1. Alarms
& An E appears in the display and an error number.
F Do not restart operation until the malfunction has been corrected.
& When the malfunction has been corrected, turn the power off and then on
8. Maintenance
M This chapter is intended for persons with skills in electrical and mechanical
L Disconnect the equipment from main power supply before starting
F Please observe the maintenance intervals.
8.1. Maintenance intervals
F The given maintenance intervals are average values.
8.2. Servicing the Loader
M Disconnect the unit from main power supply by unplugging it.
8.2.1. Changing the sealing ring of the outlet flap
F Make sure the new sealing ring (C)
& Order number sealing ring material outlet: ID 29258
8.2.2. Adjusting the dump valve sensor
8.2.3. Cleaning the unit
& Order number
Page
8.2.4. Replacing carbon brushes at the motor
M This work must be carried out by qualified personnel only.
F Verify that no cables are pinched or cut.
Page
Page
Page
Page
Page
10. Spare parts list
M This spare parts list is intended to be used only by trained personnel.
& Wear Code:
Page
10.1. SSE-2, 230 V, 50 Hz
10.2. SSE-2, 110 V, 60 Hz
10.3. SSE-2, 230 V, 50 Hz with active cleaning
10.4. SSE-2, 110 V, 60 Hz with active cleaning
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
Page
SSE-2
Quick Start Guide 1-1
1. Quick Start Guide