Operating Instructions Single Conveyor Unit SSE-2
Sterling Material Processing
P/N882.00608.00
SM4-615
SSE-2 Sterling Material Processing
Technical service
Telephone: 800 Edition: 07/02
SSE-2
Sales and Contracting Department
Parts and Service Department
SSE-2
Table of contents
SSE-2
General instructions
1. General instructions
SSE-2
General instructions
SSE-2 1.1. Warnings and symbols
1.3. Legal basis
SSE-2 1.2. Explanations and information
1.4. Fields of applications
1.5. Notes on usage
Safety instructions
2. Safety instructions
SSE-2
Safety instructions
SSE-2 2.1. For your safety
General
Assembly
Safety instructions
SSE-2
Maintenance
Safety instructions
SSE-2
Operation
Safety instructions
2.2. For the operating safety of the equipment
SSE-2
Putting into operation
3. Putting into operation
SSE-2
Putting into operation
SSE-2 3.1. Checking the pipe system
Putting into operation
SSE-2 3.2. Adjusting the suction pipes
If the conditions points 3 + 4 are not met
If the conditions points 3 + 4 are met
Setting the conveying time
SSE-2 3.3. Setting the controller
Putting into operation
The conveying capacity is too low
3.4. Initial conveying operations
3.5. Switching off the unit
Setting the line clear time
SSE-2
Error and error correction
4. Error and error correction
SSE-2
The following error messages can be displayed “E1
Error and error correction
SSE-2
SSE-2
Error and error correction
Maintenance
5. Maintenance
SSE-2
Please observe the maintenance intervals
Maintenance
SSE-2
5.2. Servicing the conveyor
SSE-2 5.1. Maintenance intervals
Maintenance
SSE-2
Maintenance
Maintenance
SSE-2 5.2.2. Adjusting the flap switch
C B A
Maintenance
SSE-2 5.2.3. Cleaning the unit
or optional, active cleaning
SSE-2
Maintenance
Maintenance
SSE-2 5.3. Replacing carbon brushes at turbine
SSE-2
Maintenance
Observe that no cables will be squeezed
Functional description
6. Functional description
SSE-2
Functional description
SSE-2 6.1. General
Functional description
SSE-2 6.2. Controller
Functional description
SSE-2
Optional
Transport, Assembly and Storage
7. Transport, Assembly and Storage
SSE-2
SSE-2 7.1. Transport and Packing
7.2. Assembly
7.3. Storage
Transport, Assembly and Storage
Assembly instructions
8. Assembly instructions
SSE-2
Assembly instructions
SSE-2 8.1. Assembly
Assembly SM4-615
Assembly instructions
SSE-2
8.3. Mounting onto a machine hopper
SSE-2 8.2. Mounting on the processing machine
Assembly instructions
A material hopper VT 1,0 is required
Assembly instructions
8.5. Mounting onto dosing station DT
SSE-2
A material hopper VT 1,0 is required
8.7. Mounting the suction pipe MV
SSE-2 8.6. Material feed
Assembly instructions
8.9. Electrical connection
SSE-2 8.8. Pipework
Assembly instructions
SSE-2
Assembly instructions
Terminals X2 = Power supply X4 = Blower
Assembly instructions
X5 = Cleaning X6 = Clearing X9 = Alarm X3 = PE
X5 = Flap switch X6 = acknowledgement key
Assembly instructions
8.11. Installing the accessories
SSE-2
Technical data
9. Technical data
SSE-2
Optional Features
Technical data
SSE-2
SSE-2 Basic Version
Dimension Sheet
Technical data
SSE-2
SM4-615
Spare parts list
10. Spare parts list
SSE-2
SM4-615
SSE-2
Spare parts list
SSE-2,230 V, 50 Hz / 110 V, 60 Hz
SM4-615
Spare parts list
10.1. SSE-2,230 V, 50 Hz
SSE-2
Order no
Spare parts list
10.2. SSE-2,110 V, 60 Hz
SSE-2
10.4. SSE-2,110 V, 60 Hz with active cleaning
10.3. SSE-2,230 V, 50 Hz with active cleaning
Spare parts list
SSE-2
Spare parts list
SSE-2 10.5. Accessories
Please observe the operating manuals in chapter
SM4-615
Accessories
11. Accessories
SSE-2
Electrical manual
12. Electrical manual
SSE-2