Sterling operating instructions SSE-2 5.2.2. Adjusting the flap switch, C B A, Maintenance

Models: SSE-2

1 58
Download 58 pages 63.95 Kb
Page 27
Image 27
SSE-2

SSE-2

5.2.2. Adjusting the flap switch

Remove the connecting plug “flap switch” from the connection housing of the hop- per.

Connect an ohmmeter to PINS 2 and 3 of the connecting plug “flap switch”.

Release the nuts (A) of the flap switch (B) until the support can be displaced.

Open the outlet flap (C) so far that the front tip of the outlet flap is approx. 30 mm (1.2") away from the sealing surface.

Displace the flap switch (B) until the con- tact of the magnet switch is closed.

Tighten the nuts (A) of the flap switch.

Check the adjustment:

In case of free hanging outlet flap (empty hopper loader) the contact of the magnet switch must be closed.

C B A

Outlet flap

If the outlet flap cannot be properly adjusted, replace the flap switch or the outlet flap with magnet.

Install the hopper.

&

Order numbers

switch with plug:

ID 29570

outlet flap with magnet:

ID 28647

SM4-615

Maintenance 5-5

Page 27
Image 27
Sterling operating instructions SSE-2 5.2.2. Adjusting the flap switch, C B A, Maintenance