P/N882.00608.00
Sterling Material Processing
Operating Instructions Single Conveyor Unit SSE-2
SM4-615
Telephone: 800 Edition: 07/02
Technical service
SSE-2 Sterling Material Processing
SSE-2
Parts and Service Department
Sales and Contracting Department
Table of contents
SSE-2
SSE-2
SSE-2
1. General instructions
General instructions
SSE-2 1.1. Warnings and symbols
General instructions
1.4. Fields of applications
SSE-2 1.2. Explanations and information
1.3. Legal basis
1.5. Notes on usage
SSE-2
2. Safety instructions
Safety instructions
General
SSE-2 2.1. For your safety
Safety instructions
SSE-2
Safety instructions
Assembly
SSE-2
Safety instructions
Maintenance
Operation
SSE-2
2.2. For the operating safety of the equipment
Safety instructions
SSE-2
3. Putting into operation
Putting into operation
SSE-2 3.1. Checking the pipe system
Putting into operation
If the conditions points 3 + 4 are not met
SSE-2 3.2. Adjusting the suction pipes
Putting into operation
If the conditions points 3 + 4 are met
Putting into operation
SSE-2 3.3. Setting the controller
Setting the conveying time
The conveying capacity is too low
Setting the line clear time
3.5. Switching off the unit
3.4. Initial conveying operations
SSE-2
SSE-2
4. Error and error correction
Error and error correction
SSE-2
Error and error correction
The following error messages can be displayed “E1
Error and error correction
SSE-2
SSE-2
5. Maintenance
Maintenance
SSE-2
Maintenance
Please observe the maintenance intervals
Maintenance
SSE-2 5.1. Maintenance intervals
5.2. Servicing the conveyor
Maintenance
SSE-2
C B A
SSE-2 5.2.2. Adjusting the flap switch
Maintenance
or optional, active cleaning
SSE-2 5.2.3. Cleaning the unit
Maintenance
Maintenance
SSE-2
SSE-2 5.3. Replacing carbon brushes at turbine
Maintenance
Observe that no cables will be squeezed
Maintenance
SSE-2
SSE-2
6. Functional description
Functional description
SSE-2 6.1. General
Functional description
SSE-2 6.2. Controller
Functional description
Optional
SSE-2
Functional description
SSE-2
7. Transport, Assembly and Storage
Transport, Assembly and Storage
7.3. Storage
7.2. Assembly
SSE-2 7.1. Transport and Packing
Transport, Assembly and Storage
SSE-2
8. Assembly instructions
Assembly instructions
SSE-2 8.1. Assembly
Assembly instructions
SSE-2
Assembly instructions
Assembly SM4-615
Assembly instructions
SSE-2 8.2. Mounting on the processing machine
8.3. Mounting onto a machine hopper
A material hopper VT 1,0 is required
SSE-2
8.5. Mounting onto dosing station DT
Assembly instructions
A material hopper VT 1,0 is required
Assembly instructions
SSE-2 8.6. Material feed
8.7. Mounting the suction pipe MV
Assembly instructions
SSE-2 8.8. Pipework
8.9. Electrical connection
Assembly instructions
SSE-2
X5 = Cleaning X6 = Clearing X9 = Alarm X3 = PE
Assembly instructions
Terminals X2 = Power supply X4 = Blower
X5 = Flap switch X6 = acknowledgement key
SSE-2
8.11. Installing the accessories
Assembly instructions
SSE-2
9. Technical data
Technical data
SSE-2
Technical data
Optional Features
SSE-2 Basic Version
SSE-2
Technical data
Dimension Sheet
SM4-615
SSE-2
10. Spare parts list
Spare parts list
SM4-615
SSE-2,230 V, 50 Hz / 110 V, 60 Hz
Spare parts list
SSE-2
SM4-615
SSE-2
10.1. SSE-2,230 V, 50 Hz
Spare parts list
Order no
SSE-2
10.2. SSE-2,110 V, 60 Hz
Spare parts list
Spare parts list
10.3. SSE-2,230 V, 50 Hz with active cleaning
10.4. SSE-2,110 V, 60 Hz with active cleaning
SSE-2
Please observe the operating manuals in chapter
SSE-2 10.5. Accessories
Spare parts list
SM4-615
SSE-2
11. Accessories
Accessories
SSE-2
12. Electrical manual
Electrical manual