Sterling Material Processing
Operating Instructions Single Conveyor Unit SSE-2
P/N882.00608.00
SM4-615
SSE-2 Sterling Material Processing
Technical service
Telephone: 800 Edition: 07/02
SSE-2
Parts and Service Department
Sales and Contracting Department
Table of contents
SSE-2
SSE-2
General instructions
1. General instructions
SSE-2
SSE-2 1.1. Warnings and symbols
General instructions
SSE-2 1.2. Explanations and information
1.3. Legal basis
1.4. Fields of applications
1.5. Notes on usage
Safety instructions
2. Safety instructions
SSE-2
Safety instructions
SSE-2 2.1. For your safety
General
Assembly
Safety instructions
SSE-2
Safety instructions
Maintenance
SSE-2
Operation
Safety instructions
2.2. For the operating safety of the equipment
SSE-2
Putting into operation
3. Putting into operation
SSE-2
SSE-2 3.1. Checking the pipe system
Putting into operation
SSE-2 3.2. Adjusting the suction pipes
Putting into operation
If the conditions points 3 + 4 are not met
If the conditions points 3 + 4 are met
SSE-2 3.3. Setting the controller
Setting the conveying time
Putting into operation
The conveying capacity is too low
3.5. Switching off the unit
3.4. Initial conveying operations
Setting the line clear time
SSE-2
Error and error correction
4. Error and error correction
SSE-2
The following error messages can be displayed “E1
Error and error correction
SSE-2
Error and error correction
SSE-2
Maintenance
5. Maintenance
SSE-2
Please observe the maintenance intervals
Maintenance
SSE-2
5.2. Servicing the conveyor
SSE-2 5.1. Maintenance intervals
Maintenance
Maintenance
SSE-2
Maintenance
SSE-2 5.2.2. Adjusting the flap switch
C B A
Maintenance
SSE-2 5.2.3. Cleaning the unit
or optional, active cleaning
Maintenance
SSE-2
SSE-2 5.3. Replacing carbon brushes at turbine
Maintenance
SSE-2
Maintenance
Observe that no cables will be squeezed
Functional description
6. Functional description
SSE-2
SSE-2 6.1. General
Functional description
SSE-2 6.2. Controller
Functional description
Functional description
SSE-2
Optional
Transport, Assembly and Storage
7. Transport, Assembly and Storage
SSE-2
7.2. Assembly
SSE-2 7.1. Transport and Packing
7.3. Storage
Transport, Assembly and Storage
Assembly instructions
8. Assembly instructions
SSE-2
SSE-2 8.1. Assembly
Assembly instructions
Assembly SM4-615
Assembly instructions
SSE-2
SSE-2 8.2. Mounting on the processing machine
8.3. Mounting onto a machine hopper
Assembly instructions
A material hopper VT 1,0 is required
8.5. Mounting onto dosing station DT
Assembly instructions
SSE-2
A material hopper VT 1,0 is required
8.7. Mounting the suction pipe MV
SSE-2 8.6. Material feed
Assembly instructions
8.9. Electrical connection
SSE-2 8.8. Pipework
Assembly instructions
Assembly instructions
SSE-2
Assembly instructions
Terminals X2 = Power supply X4 = Blower
X5 = Cleaning X6 = Clearing X9 = Alarm X3 = PE
X5 = Flap switch X6 = acknowledgement key
Assembly instructions
8.11. Installing the accessories
SSE-2
Technical data
9. Technical data
SSE-2
Technical data
Optional Features
SSE-2
SSE-2 Basic Version
Technical data
Dimension Sheet
SSE-2
SM4-615
10. Spare parts list
Spare parts list
SSE-2
SM4-615
Spare parts list
SSE-2
SSE-2,230 V, 50 Hz / 110 V, 60 Hz
SM4-615
10.1. SSE-2,230 V, 50 Hz
Spare parts list
SSE-2
Order no
Spare parts list
10.2. SSE-2,110 V, 60 Hz
SSE-2
10.3. SSE-2,230 V, 50 Hz with active cleaning
10.4. SSE-2,110 V, 60 Hz with active cleaning
Spare parts list
SSE-2
SSE-2 10.5. Accessories
Spare parts list
Please observe the operating manuals in chapter
SM4-615
Accessories
11. Accessories
SSE-2
Electrical manual
12. Electrical manual
SSE-2