Sterling SSE-2 operating instructions Mounting onto dosing station DT, Assembly instructions

Models: SSE-2

1 58
Download 58 pages 63.95 Kb
Page 42
Image 42
8.5. Mounting onto dosing station DT 30

SSE-2

8.4. Mounting onto mixing hoppers with lateral inlet

A material hopper VT 1,0 is required:

Mount the material hopper onto the swan-neck of the mixing hopper.

Mount the unit onto the intermediate hopper.

VT 1,0

F

Observe the bearing capacity of the machine flange.

8.5. Mounting onto dosing station DT 30

A dosing hopper DT 30 (320 mm high) is required:

Mount the dosing hopper directly onto the dosing con- tainer of the dosing station DT 30.

Mount the unit onto the dosing hopper.

DT 30

F

Observe the bearing capacity of the machine flange.

SM4-615

Assembly instructions 8-5

Page 42
Image 42
Sterling SSE-2 Mounting onto dosing station DT, Assembly instructions, A material hopper VT 1,0 is required