English
Vertical batch freezer
8
Check that the following items are all included in the package:
- lid [5];
- beater [6], correctly fixed inside the cylinder with its knob [7] and supplied with adjustable blades [31] (1…3 according
to the model);
- extraction door [14]);
Also check that the following items are included:
- spare p art kit [11], big brush [40], medium brush [41], small brush [42];
- basin support [10], knobs [16], the lever [8] and the extraction door chute [9];
- all the technical documentation(in addition to this handbook): the Technical Handbook, the EC Conformity Certifica-
tion and Electric Test Schedule.
5.2 Machine’s parts reassembling

THEREASSEMBLING MUST BE MADEBEFORE CONNECTING THE MACHINE TO THE ELECTRIC SUP-

PLYSYSTEM.
- Screw the lever [8] in the extraction door [14];
- if the chute [9] is supplied disassembled, install it under the extraction door [14] by hooking it to the hinges [26];
- install the basin support [10] by fixing it to the front panel with knobs [16].
5.3 Electric connection
THE SUPPLY’S VOLTAGE REQUIRED BY THE DEVICE IS HIGH, SO, IT IS PARTICULARLY DANGEROUS.
THE WORKS ON THE SUPPLY’S ELECTRIC CIRCUITS MUST BE MADE WORKMANLIKE BY QUALIFIED
STAFF.
THE ELECTRIC SAFETY OF THIS AUTOMATIC DEVICE IS REACHED
ONLY WHEN THE SAME IS CORRECTLY CONNECTED, BY QUALIFIED
AND CERTIFIED PERSONNEL, TO AN EFFICIENT EARTHING SYSTEM,
MADE AS PROVIDED FOR IN FORCE SAFETY REGULATIONS.
The manufacturer must not be considered responsible for eventual damages
caused by an inadequate electric or earthing system.
All the electric device's features required for the system’s proportioning are reported
on the Technical Data Plate and on the Technical Handbook.
FOR PREPARING THE ELECTRIC SYSTEM WHICH SUPPLIES THE DEVICE, IT IS COMPULSORY TO
FOLLOW THE PRESCRIPTIVE STANDARDS IN FORCE. IN PARTICULAR: