MR0012J 9710 System Assurance Guide 5-1
5
Pre-installation ChecklistOn the following pages, verify that all issues have been addressed and resolved.
Circle either “Yes” or “No” for each item. For unresolved issues, assign a
required action with a due date to the appropriate person.
Table 5-1. Pre-installation Checklist
Item Description Yes/No Action Required/Due
Date/Person Responsible
Site Preparation
Floor plans completed
Clearance adequate
Cooling adequate
Power requirements met
Cable lengths determined
Cable routing established
Future expansion considered
Dock facilities scheduled
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Hardware Procurement
Subsystems ordered
Power cables ordered
Options or features ordered
Interface cables ordered
Interface adapters ordered
Tapes and labels ordered
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Yes/ No
Software Procurement
Software prerequisites met Yes/No