Stovax Logic Hotbox & Convector Fire Installation / Commissioning, Installation Instructions

Models: Logic Hotbox & Convector Fire

1 24
Download 24 pages 15.94 Kb
Page 17
Image 17
INSTALLATION / COMMISSIONING

INSTALLATION INSTRUCTIONS

INSTALLATION / COMMISSIONING

11.LIGHTING THE FIRE

11.1Locate the control valve on the appliance. There are two control knobs on the valve, the right hand knob controls the pilot ignition and the left hand knob controls the main burner.

11.2If your appliance has already been upgraded to battery remote control, please refer to the instructions provided with the upgrade to operate the remote control. The following instructions will work for either situation.

1

11.3Ensure that the left-hand control knob is pointing to off (11.LIGHTING THE FIRE ).

11.4Ensure that the right hand control knob is pointing to off (1.COMMISSIONING).

11.5Press in the right hand control knob and rotate it anti- clockwise until a click is heard (keep pressing in) and the knob is pointing to pilot ( Manual background ). The pilot should now light. If the pilot has not lit, repeat the procedure until it does.

11.6Keep the control knob pressed for 10 seconds and then release it, the pilot should stay alight. If the pilot goes out, repeat the procedures until it does.

11.7If the pilot will not light after repeated attempts, contact the retailer or installer from whom the appliance was purchased.

11.8Turn the right hand control to point to main burner ( Manual background ). The appliance can now be controlled using the left hand control knob.

11.9Turn the left hand control knob to point to low fire ( Manual background ), the main burner will light on low. The burner can now be controlled between low and high settings. Turn the control knob anticlockwise increase the flame height and clockwise to decrease the flame height.

THE YELLOW FLAMES WILL APPEAR WHEN THE FIRE HAS GAINED SUFFICIENT HEAT - TYPICALLY 10 TO 20 MINUTES.

1.COMMISSIONING

1.1Close all windows and doors to the room, check all controls, and allow fire to burn on maximum for 5 minutes. Test for spillage of flue products using a smoke match. Pass the lighted smoke match along the top front edge just inside the opening or canopy. See diagram 1.

1 Manual background

HOTBOX

1.2If the fire spills, run for a further 10 minutes and re-check. If the flue restrictor plate has been fitted to the fire this can be removed to assist flue flow if required. ( Convector only)

1.3If there are extractor fans in the room or adjacent rooms, the spillage test must be repeated with the extractors running on maximum.

IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE AND SEEK EXPERT ADVICE.

For future reference record the installation details on the commissioning sheet on page 3 of these instructions.

17

Page 17
Image 17
Stovax Logic Hotbox & Convector Fire manual Installation / Commissioning, Installation Instructions, Lighting The Fire