Page 28

Electrical Wiring Diagram
Bali Domestic (60 Hz)

NOTE: FOR240 VOLTS PERMANENTLY CONNECTED UNIT:

1. MOVE THE RED WIRE FROM POS. 1 TO POS. 3 ON THE TB1

TERMINAL BLOCK.

2. IF THE SPA IS TO BE OPERATED ON A 40A SERVICE. REMOVE THE

JUMPER PROVIDED AT LOCATION JP1-&2..

Note: For 240 VAC 4-Wire Permanent Connected Unit:
1. Remove and discard the GFCI Cord
2. Permanently connect to the power supply. The electrical wiring
MUST meet the requirements of NEC or local codes.
3. Move the RED wire from position 1 to position 3 on the TB1
terminal block (left).
4. If the hot tub is to be operated on 40A service, remove the
jumper provided at location JP1 #1&2 on circuit board.
3
OZONATOR
O3
GRN

TB1

RED
WHT
WHT
WHT
BLK
BLK
RED
RED RED
BLK BLK
BLK
BLK
21
HEATER
1 kW @ 120 VAC
4 kW @ 240 VAC
HI - LIMIT / FREEZE SENSOR
TEMPERATURE SENSOR
J1
J2
J3
HOT TUB
LIGHT
TRANSFORMER
120 VAC

J4

W
JP1
4
23
1
120 VAC, 1 PHASE, 60 Hz
SERVICE REQUIREMENTS 120 VAC,
15 A 60 HZ, SINGLE PHASE
PUMP
HI
LO
THERM
SWITCH
PRESSURE SWITCH
Bali Panel
F1
20A, 250V
SC-20