Figure 1:
CONDUIT HOLES | DUCT DETECTOR | |
HOUSING | ||
|
FOAM | INLET SAMPLING TUBE |
GASKETS | (SUPPLIED SEPARATELY) |
TUBE
END
PLUG
See Note 1 below for inlet sampling tube and detector supply information.
DETECTOR BASE
HOUSING
MOUNTING SCREWS
EXHAUST
FILTER ADAPTER
DETECTOR HEAD
(SUPPLIED SEPARATELY)
SAMPLING TUBE
PC BOARD
INSULATOR
DUCT DETECTOR
COVER
SAMPLING TUBE
MOUNTING
SCREWS
TEST MAGNET
FILTERS
The DH500ACDCs are built to operate on 120/240 VAC or 24 VAC/DC. Two
Contents Of The Duct Detector Housing Kit
The DH500ACDC Air Duct Detector Housings consist of the following items: (See Figure 1.)
1.Complete housing base and cover assembly.
2.Two #10 sheet metal mounting screws.
3.Two sampling tube filters.
4.One test magnet.
5.Drilling template.
6.Two
7.Two foam gaskets.
8.Four #6
9.One filter adapter.
10.One inlet tube end plug.
11.Two #10 speed nuts.
NOTE: The inlet sampling tube must be ordered separately. It must be the correct length for the width of the duct where it will be installed. See Table 1 to determine the inlet tube required for different duct widths. A smoke detector head (1551 ionization or 2551 for photoelectronic) must be ordered separately.
Installation Sequence | Page | |
Step 1. Verify duct air flow direction and velocity | ............2 | |
Step 2. Drill the mounting holes | 2 | |
Step 3. Mount duct housing | 3 | |
Step 4. Install the inlet tube | 3 | |
Step 5. Complete the field wiring | 5 | |
Step 6. | Install the filters | 7 |
Step 7. | Perform detector check | 7 |
Step 8. | Install the cover | 9 |
Step 9. | Perform the final system check (Testing) | 9 |
Step 1. Verify Duct Air Flow Direction And Velocity The DH500ACDCA is designed to be used in air handling systems having air velocities up to 500 feet per minute. Be sure to check engineering specifications to ensure that the air velocity in the duct falls within these parameters. If necessary, use a velocity meter to check the air velocity in the duct.
Step 2. Drill The Mounting Holes
Remove the paper backing from the drilling template. Affix the template to the air duct at the desired mounting loca- tion. Make sure the template lies flat and smooth on the air duct. Center punch hole targets and remove the template. Drill the holes as indicated on the template. Slide the two speed nuts over the two small holes (Hole A) next to the sampling tube bushing holes (Hole B) previously drilled in the duct. (See Figure 2.)
Location of detectors mounted in or on air ducts should be at least six duct widths downstream from any duct openings, deflection plates, sharp bends, or branch con- nections.
2 |