Tanaka TBS270PF/PN, TBC-340/D, TBC-2510 Throttle wire/stop cord, Installation of blade guard -8,8B

Models: TBS270PF/PN TBC-300/SDH3010 TBC-2501 TBC-250 TBC-340PF/PFD TBC-250PF/PFD TBC-2510 TBC-340/D

1 21
Download 21 pages 30.29 Kb
Page 7
Image 7
Throttle wire/stop cord

TBC-250/250PF/PFD,TBC-2501,TBC-2510,TBC-270PF/PFD TBC-270PN/PND,TBC-300/SDH/3010,TBC-340/D,TBC-340PF/D

Owner’s Manual

Throttle wire/stop cord

Remove the air cleaner cover. (Fig. 1-4) Connect stop cords. (Fig. 1 -5)

Connect throttle wire end to carburetor. (Fig. 1 -6)

Cover throttle wire and stop cords together with protective tube provided up to air cleaner cover. (Fig. 1 -7)

Installation of blade guard (Fig. 1-8, 8B)

Install the blade guard on the drive shaft tube against the gear case.

Tighten the guard bracket firmly so that the blade guard does not swing or move down during operation.

When using a trimmer head (2), locate the guard above the gear case. (Fig. 1-8C, 8D,8E)

CAUTION!

Some blade guards are equipped with sharp line limiters. Be careful when handling it.

www.tanaka-usa.com

6

custsvc@tanaka-ism.com

Page 7
Image 7
Tanaka TBS270PF/PN, TBC-340/D, TBC-2510, TBC-250PF/PFD, TBC-2501 Throttle wire/stop cord, Installation of blade guard -8,8B