22 Model C043Operating Procedures
130503
Step 5
On the back half of the hoppers, install the hopper
covers that have the concave lip. For maximum
capacity, the hopper should be full.
Figure 35
Step 6
Place the beater switch and the refrigeration switch
in the “ON” position. Set the timer for one minute.
Note: The refrigeration switch will not activate
unless the beater switch is on.
Figure 36
Step 7
After one minute has expired, turn the flow
adjustment knob to “1” and set the timer for three
minutes.
Note: Whenever an adjustment is made, first turn
the adjustment knob all the way to “5” and then back
to the desired number.
Figure 37
Step 8
After three minutes have expired, open the draw
arm plate. If the custard is too soft, close t he draw
arm plate and wait one minute. Repeat until the
custard looks servable.
Note: The first couple inches of custard will force
out any remaining sanitizing solution and should be
discarded.
Step 9
Close the draw arm plate. Using sanitized hands,
install a sanitized product chute.
Figure 38