14 Model 161Operating Procedures
120501
Step 3
Place the large o--ringsinto the grooves on the back of
the machine door and lubricate.
Figure 9
Step 4
Slide the front bearings over the baffle rods so the
flanged edge is against the door. Place the white
plastic guide bearings on the end of the baffle rods.
DO NOT lubricate the front bearings or the guide
bearings.
Figure 10
Step 5
Slide the slotted portion of the handscrews into the
slots in the freezer door.
Step 6
With both hands, hold the sides of the freezer door and
insert the baffle rods into the center of the beat er
assemblies. The white guide bearings must fit
securely in the holes of the drive shafts.
Step 7
Finger--tighten the handscrews, making sure they are
tightened equally and that the door is snug. Do not
over--tighten the handscrews.
Figure 11
IMPORTANT! Handscrew and door damage can
result if the handscrews are over --tightened or if
one handscrew is tighten ed more than the other.
Step 8
Install the valve seal into the grooves on the center
draw valve and lubricate. This specialseal will prevent
the mix in one freezing cylinder from t raveling into the
second cylinder.
Figure 12