
16 Model 161Operating Procedures
Step 13
Snap the design caps over the bottom of the freezer
door spouts.
Figure 17
Step 14
Lay the feed tubes in the bottom of the mix hoppers.
Step 15
Install the front drip tray and splash shield under the
freezer door.
Figure 18
Step 16
Install the drip pans.
Figure 19
SanitizingStep 1
Prepare an approved 100 PPM sanitizing solution
(examples: 2--1/2 gal. [9.5 liters] of Kay--5Ror2
gal. [7.6 liters] of Stera--SheenR). USE WARM WA-
TER AND FOLLOW THE MANUFACTURER’S
SPECIFICATIONS.
Step 2
Pour one gallon (3.8 liters) of sanitizing solution into
thehopper and allow it to f low into the freezing cylinder.
Figure 20