Appendix C: Performance Verification

1.Install test hookup and set test equipment controls:

a.Hook up termination board: Connect the AWG2021 rear ECL digital data output through a digital data output cable to the termination board (see Figure C-20).

b.Hook up power supply: Connect the power supply output through the test leads to the GND TP100 and ±2VD TP120 terminals on the termination board.

c.Hook up oscilloscope:

￿Connect the oscilloscope probe to the CH1 vertical input.

￿Connect the probe ground-clip to the GND TP200 terminal on the termination board.

AWG2021

￿s￿illos￿op￿

ECL Digit￿l D￿t￿ ￿ut C￿￿l￿

Pow￿r Supply

GND

±2V

￿￿rmin￿tion Bo￿r￿

Figure C￿20: ECL Digital Data Out Initial Test Hookup

d.Set oscilloscope controls:

Vertical . . . . . . . . . . . . . . . . . . . . . . . . . CH1 Scale . . . . . . . . . . . . . . . . . . . . . . . . 0.1 V/div. Input Impedance . . . . . . . . . . . . . . 1 MW