
Appendix C: Performance Verification
1.Install test hookup and set test equipment controls:
a.Hook up termination board: Connect the AWG2021 rear ECL digital data output through a digital data output cable to the termination board (see Figure
b.Hook up power supply: Connect the power supply output through the test leads to the GND TP100 and ±2VD TP120 terminals on the termination board.
c.Hook up oscilloscope:
Connect the oscilloscope probe to the CH1 vertical input.
Connect the probe
AWG2021
sillosop
ECL Digitl Dt ut Cl
Powr Supply
GND
±2V
rmintion Bor
Figure C20: ECL Digital Data Out Initial Test Hookup
d.Set oscilloscope controls:
Vertical . . . . . . . . . . . . . . . . . . . . . . . . . CH1 Scale . . . . . . . . . . . . . . . . . . . . . . . . 0.1 V/div. Input Impedance . . . . . . . . . . . . . . 1 MW
C44 | AWG2021 User Manual |