3.0INSTALLATION

3.0INSTALLATION

3.1PanelMounting:

Section8ofthismanualshowsanoutlinedrawingdetailingpanelcutoutforastandardHastingsCVTGauge. Installthe meteronthepanelusingthesuppliedhardware.

3.2 GaugeTubeInstallation:

Situatethegaugetubeinaclean,dryvacuumsystemwiththeopenendpointingdownsoastobeself-drainingshouldany vaporscondenseinit(seeSection6.0). Screwmetaltubesinto1/8"femaleNPTthreadsusingasuitablesealant;Teflon tapeisrecommended,oruseHastingsQuickConnectO-ringsealsforavacuumtightinstallation. DonotuseQuick ConnectiftubewillseepressuresgreaterthanATM.

ForinformationonHastingsInstallationAccessories,refertoProductBulletin#352.

Gaugetubemaybeoperatedimmediately,butbestresultswillbeobtainedafterthetubehasoutgassedforapproximately1 hour.

Tubesaretemperaturecompensated,butdorespondtorapidtransientenvironmentalchanges(greaterthan5degreeC/ min.) Tominimizetemperaturetransientseffectspleaseinsulategaugetubewithglasswraporothersuitableinsulation wrap.

PAGE 8

Page 8
Image 8
Teledyne HVC-282 instruction manual 3.0INSTALLATION, 3.1PanelMounting, GaugeTubeInstallation