FOR HVAC INSTALLER ONLY
3.4C Ducting for Fresh Air
Fresh air can be brought into the structure by connecting a insulated duct from outside to the 6”
1.Outside air is filtered before entering the building.
2.Outside air will be dehumidified before entering if the
3.Drawing air from outside and blowing inside aids in slightly pressurizing the structure. This helps prevent dirty and humid air from entering elsewhere. It also reduces the potential for carcinogenic radon gas to enter and provides
4.Adequate exhaust fans are recommended in the bath rooms and kitchen.
In cold climates or areas where the outdoor dew point is low at times, ventilation can be used to dehumidify the structure. This is accomplished by bringing the dry, low dew point air into the structure during these times. This approach is often more economical than running the dehumidifier to remove excess moisture from the structure. In cold climates, it is critical to adequately ventilate to reduce the inside moisture content to avoid moisture accumulating in the wall cavities. For example; in a house that experiences condensation on the interior surface of the windows during the winter, increasing the amount of ventilation will often cure the problem.
An insulated 6" diameter duct is generally sufficient to provide up to 125 CFM of outside air. Large quantities of outside air will impact
The outside air duct should be connected to the 6” round collar on the filter enclosure of the unit. The 6” round collar includes a manual damper. Adjust the manual damper to provide the desired amount of fresh air for ventilation. The amount of fresh air should be based on the size and occupancy of the residence. If you are unsure of your ventilation air requirements, consult the factory by calling
3.4D Installation in a Basement or Crawlspace with an Existing Forced Air HVAC System
If the existing system has multiple returns, select one to disconnect from the existing forced air system and use it for the dedicated
much of the time or install a separate return from the open part of the house.
If the structure in which the
Basement Installation: Install a separate 10” return for the
Crawl Space Installation: Install a separate return for the