All installations and services must be performed by qualified service personnel.
Figure 8
2. CONNECTING THE EXHAUST VENT TO THE INDUCER
a.Insert the end of the 2”dia. PVC elbow (2" dia. PVC tee assembly for CDX1 horizontal installations) onto the outlet of the inducer blower assembly. Measure the length of 2” dia. PVC pipe needed to clear the furnace side casing, while allowing for the
NOTE: For CDX1 series units, a length of 2" dia. PVC pipe and a 2" dia PVC tee assembly are supplied with the unit. For the
16