Thermo Products OH2-56, OT5-85, OH16-125, OL16-125, OT16-125 Customer, Heating, System, Combustion

Models: OC5-85 OC2-56 OL11-105 OL2-56 OL20-151 OL39-320 OH11-105 OH5-85 OT11-105 OL33-200 OH3-72 OL37-250 OL5-85 OT16-125 OL16-125 OH16-125 OH2-56 OT5-85

1 32
Download 32 pages 24.61 Kb
Page 19
Image 19
CUSTOMER

All installations and services must be performed by qualified service personnel.

COMBUSTION AND EFFICIENCY TESTING FOR THERMO PRIDE OIL FIRED CENTRAL FURNACES.

Complete this form for each Thermo Pride furnace installed. Read instruction manual carefully before making tests. Retain this form with furnace.

CUSTOMER

NAME

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ADDRESS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CITY, STATE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEATING

BURNER MODEL NO.

BLAST TUBE LGTH.

AIR SHUTTER OPENING

 

 

 

 

 

 

 

 

 

 

 

 

 

INS.

 

 

 

 

 

% OF MAX. (EST)

SYSTEM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBUSTION CHAMBER

CONDITION

 

MATERIAL

 

FURNACE MODEL

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

TYPE OF VENTING SYSTEM

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MASONRY

 

 

 

METAL

 

 

 

 

 

SIDEWALL

 

 

MASONRY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHIMNEY

 

 

 

CHIMNEY

 

 

 

 

POWER VENTER

 

 

CHIMNEY

 

 

 

 

 

 

 

 

 

 

 

 

METAL

 

 

 

MASONRY CHIMNEY

 

 

 

 

 

 

W/INDUCER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CHIMNEY

 

 

 

W/METAL LINER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W/INDUCER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

FUEL LINE FILTER

 

DRAFT CONTROL

 

 

 

FURNACE SERIAL NUMBER

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMBUSTION

 

 

 

 

 

 

 

INITIAL

 

SERVICE

SERVICE

SERVICE

 

 

 

 

 

 

 

INSTALLATION

 

TESTS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Operate burner

CO2 in stack pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

at least 10

Draft Over-fire

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

minutes before

Draft in stack pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

starting tests.)

Smoke number

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Gross stack temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Furnace room temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Net stack temp.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(Gross stack minus

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

furnace room temp.)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Efficiency

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Nozzle size and spray

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Oil pump pressure

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Operation of Controls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Burner Safety Controls

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Check for oil leaks

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Tests taken by

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Date

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTES:

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

INSTALLER NAME & ADDRESS

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

15

Page 19
Image 19
Thermo Products OH2-56, OT5-85, OH16-125, OL16-125, OT16-125, OL5-85, OL37-250, OH3-72 Customer, Heating, System, Combustion