Toshiba RAV-SP420AT2-UL „Installation of Outdoor Unit, Barriers in front and back of unit

Models: RAV-SP420AT2-UL RAV-SP300AT2-UL RAV-SP360AT2-UL

1 24
Download 24 pages 17.47 Kb
Page 11
Image 11
Barriers in front and back of unit

Outdoor Unit

Barriers in front and back of unit

Open above and to the right and left of the unit.

The height of an barrier in both the front and rear of the unit, should be lower than the height of the outdoor unit.

Standard installation

1. Single unit installation

39.4” (1000) 5.9” (150) or more or more

2.Multiple unit installation

a. Intake and supply parallel

Installation Manual

„Installation of Outdoor Unit

Before installation, check the strength and horizontal of the base so that abnormal sounds do not emanate.

According to the following base diagram, fix the base firmly with the anchor bolts.

(Anchor bolt, nut: 3/8” (M10) x 4 pairs)

 

 

Drain hole

20.7” (525)

5.9” (150)

 

5.9” (150)

 

 

 

23.6” (600)

 

 

 

 

 

 

 

 

1.8” (45)

 

15.8” (400)

14.4” (365)

 

 

 

Drain

nipple mounting hole Drain hole

11.8” (300) or more

11.8” (300) or more

39.4” (1000) 7.9” (200) or more or more

1)Field fabricate a snow or an ice stand for the unit using the above dimension.

2)Place snow or ice stand on a foundation/pad and secure it to the foundation/pad and secure it to the foundation/pad by anchor bolts.

NOTE

When the outdoor unit is anchored directly on the foundation/pad (cooling only protrude a minimum of 0.6” (15 mm)).

b.Intake and supply in line

Open above and to the right and left of the unit. The height of an obstacle in both the front and rear of the unit should be lower than the height of the outdoor unit.

Standard installation

39.4”

11.8”

59.1”

78.7”

7.9”

(1000)

(300) or

(1500)

(2000)

(200)

or more

more

or more

or more

or more

0.6” (15 mm) or less

EN

– 10 –

10-EN

Page 11
Image 11
Toshiba RAV-SP420AT2-UL „Installation of Outdoor Unit, Barriers in front and back of unit, Standard installation