Instructions

1.Write in the time you want each schedule period to begin.

2.Write in the heating temperature (H) and cooling temperature (C) you want for each period.

3.Circle the fan operation you desire for each period.

4.Begin with Programming the First Day!

Pressed the wrong key?

Want to start over?

DonÕt worry! You can always press

Run

Program

to return display to normal.

 

Pub. No. 22-5127-04

35

69-1214

Page 35
Image 35
Trane XT300C, XT302C manual Instructions