![](/images/new-backgrounds/1142142/14214213x1.webp)
Maintenance — Continued
Replacing the fuse
CAUTION: Ensure that the
To replace the fuse in the
1.Ensure the ON/OFF switch on the Power Module is in the OFF position.
2.Disconnect the AC power cord from the external power source.
3.Insert a small flat blade screwdriver into the groove on the front, inside edge of the fuse holder, as shown in Figure 11A.
4.Carefully pull the fuse holder from the Power Module. See Figure 11B.
(A ) | (B ) |
Power ON/OFF
Switch
Fuse
Place Small Flathead
Screw Driver Here
Fuse
Holder
Figures 11 A & B: Replacing Fuse
4.Remove the fuse from the fuse holder.
5.The replacement fuse MUST BE the same amperage and voltage rating.
6.Insert the fuse into the holder.
7.Slide the fuse holder fully into the Power Module.
8.Connect the power cord to Power Module and to the external power.
9.Push the power ON/OFF switch to the ON position.
Technical Specification
For use with Transition Networks Model
Dimensions: | 8.3" x 8.4" x 2.7" (211 mm x 211 mm x 69 mm) | |
Weight: | 4 lb. (6.35 kg) approximately |
|
Power Input: | ||
| (typical with a | |
Voltage Tolerance: | ± 10% |
|
3.5A max. |
| |
Inrush Current: | 13A max. ( peak starting current) @ high line | |
Transient Recovery Time: | 1ms max. |
|
Power Output: | 12VDC at 16.67 Amp max. |
|
Power Factor: | >0.6 – 0.95, 10 to 100% load respectively | |
Fuse: | 6.3 Amp/250 Volts |
|
MTBF: | Greater than 25,000 hours | |
| Greater than 68,750 hours (Bellcore7 V5.0) | |
Environment: | Operating temperature: | 0 to 50°C (32 to 122°F ) |
| Storage temperature: |
|
| Humidity: | 5 to 90%, non condensing |
Warranty: | Lifetime |
|
12 Tech Support: | techsupport@transition.com – Click the “Transition Now” link for a live Web chat. | 13 |