|
| TABLE OF CONTENTS |
|
|
| SECTION I DESIGN |
|
For The System Design Engineer | Page | ||
1. | Introduction | 1 | |
2. | General Description | 1 | |
3. | System Design and Layout | 2 | |
|
| SECTION II INSTALLATION |
|
For The Installing Contractor |
| ||
1. | Unpack and Inspect | 3 | |
2. | Position Air Cleaner Cabinet | 3 | |
3. | Connect Adjoining Ductwork | 3 | |
4. Mount Detergent System | 3 | ||
5. | Connect Drain | 3 | |
6. Connect Wash Water Supply | 3 | ||
7. | Mount Control | 4 | |
8. | Complete Wiring |
|
|
A. High Voltage Wiring | 4 | ||
B. Primary Wiring | 4 | ||
9. | Fire Suppression System (when factory supplied) | 4 | |
10. Checkout for System | 4 | ||
|
| SECTION III OPERATION AND SERVICE |
|
For The Maintenance Engineer |
| ||
1. | Introduction and Principle of Operation | 5 | |
2. | Initial | 6 | |
3. | Wash Control and Detergent System Settings | 8 | |
4. | Routine Maintenance | 9 | |
5. | Preventative Maintenance | 9 | |
|
| SECTION IV TROUBLESHOOTING |
|
For The Maintenance Engineer |
| ||
1. | Trouble Shooting | 11 | |
2. | Spare Parts | 12 | |
3. | Trouble Reference Chart | 13 | |
|
| SECTION V REFERENCE |
|
Illustrations and Drawings |
|
| |
Figure 1 | General Component Arrangement | 14 | |
Figure 2 | Unit Outline | 15 | |
Figure 3 | Control Outline | 16 | |
Figure 4 | Detergent System Outline | 17 | |
Figure 5 | Piping Schematic | 18 | |
Figure 6 | Field Wiring Diagram | 19 | |
Figure 6a | Second Wash Section Field Wiring Diagram | 19a | |
Figure 7 | Fire Control System Outline | 20 | |
Figure 8 | ATS Control Schematic Page 1 | 21 | |
Figure 9 | ATS Control Schematic Page 2 | 22 | |
Figure 10 | AIR BOSS Control Schematic Page 1 | 23 | |
Figure 11 | AIR BOSS Control Schematic Page 2 | 24 | |
Figure 12 | ATS Remote Box Schematic Page 1 | 25 | |
Figure 13 | ATS Remote Box Schematic Page 2 | 26 | |
Figure 14 | Standard Single Section Sequence Timing | 27 |