Owner’s Manual

Extended-Run 3-Phase Battery Cabinet

CUS

Not suitable for mobile applications.

1 – Introduction

2 – Important Safety Instructions

3 – Battery Cabinet Installation

3-1 Preparation

3-2 Transportation

3-3 Mechanical Check

3-4 Internal Wiring (Typical)

3-5 Preliminary Electrical Check

3-6 Battery Cabinet Placement

3-7 Electrical Connection

3-8 Battery Charger Electrical Connection (Select Models)

3-9 Final Electrical Check

4 – Operation and Charging

4-1 Determine Charging Voltages

4-2 Initial Charge

4-3 Operational Check

4-4 Acceptance Test (Optional)

5 – Maintenance

5-1 Maintenance Schedule

5-2 Fuse Replacement

6 – Diagrams

6-1 Battery Cabinet Diagram (4 Shelves)

6-2 Battery Cabinet Diagram (3 Shelves)

6-3 Battery and Breaker Diagrams (240 VDC)

6-4 Battery and Breaker Diagrams (+/- 240 VDC)

6-5 Battery Charger (Select Models)

7 – Specifications

7-1 Dimensions and Floor Loading

7-2 Recommended Torque

8 – Storage and Service

9 – Warranty

1111 W. 35th Street, Chicago, IL 60609 USA

+1.773.869.1234 • www.tripplite.com

Copyright © 2008 Tripp Lite. All trademarks are the sole property of their respective owners.

p.2 p. 3 p. 5 p. 5 p. 5 p. 5 p. 6 p. 6 p. 6 p. 7 p. 7 p. 7 p. 8 p. 8 p. 8 p. 8 p. 8 p. 9 p. 9 p. 9 p. 10 p. 10 p. 11 p. 12 p. 13 p. 14 p. 15 p. 15 p. 15 p. 16 p. 16

Page 1
Image 1
Tripp Lite Extended-Run 3-Phase Battery Cabinet owner manual