Auger Shaft
At least once a season, remove the shear pins from the auger shaft. Spray lubricant inside the shaft and around the spacers and the flange bearings found at either end of the shaft. See Fig.
Shear Pin
Auger Control
Refer to the Assembly and
Skid Shoes
Refer to the Assembly and
Track Tension
Over time the track can stretch. Adjust the track tension as follows (See Fig.
Figure
Adjustments
Shift Cable
If the full range of speeds (forward and reverse) cannot be achieved adjust the shift cable as follows:
1. | Place the shift lever in the fastest forward speed position. |
Track Side Plate
Flange Lock Nut
“J” Bolt
Front Track
Idler Wheel
Hex Nut
2. | Loosen the hex nut on the shift cable index bracket. See | ||||||||
| Fig. | ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Figure
3.Pivot the bracket downward to take up slack in the cable.
4.Retighten the hex nut.
Figure
1.Loosen the hex nuts on the front track idler wheels on each side of the snow thrower.
2.Tighten the flange lock nut on the front of the track side plate. This pulls the “J” bolts attached to the axle and tightens the tracks.
3.Tighten the hex nuts on the front track idler wheels.
Section 6 — Maintenance & Adjustments |
| 17 |
| ||
|
|
|