
Assembly & | 3 |
| |
|
|
Contents of Crate |
|
• | One Snow Thrower | • | Two Replacement Auger Shear Pins | • | One Chute Assembly |
• | One Snow Thrower Operator’s | • | One Product Registration Card | • | One Chute Control Rod |
| Manual |
|
|
|
|
•One Engine Manual
AssemblyHandle
1.Place the shift lever in the
2.Remove the lower plastic wing nut and carriage bolt from each side of the upper handle; raise the upper handle assembly until it snaps over the lower handle. See Fig.
NOTE: Make certain the cables are seated properly in the roller guides. See Figure
Figure
Chute Control Head
Chute Support
Bracket
Figure
3. Looking beneath the handle panel, check that all of the cables (steering, auger, shift, and drive) are properly routed Chute and not pinched or kinked.
4. | Secure the handle by tightening the plastic knob located |
|
| on both the left and right sides of the handle. Remove |
|
| and discard any rubber bands, if present. They are for |
|
| packaging purposes only. | Chute Base |
Chute Assembly |
| |
1. | Remove cotter pin, wing nut and hex screw from chute | Figure |
| control head. Remove clevis pin and |
|
| from chute support bracket. See Fig. |
|
7