Assembly & |
|
|
|
| 3 | |
|
|
|
|
|
| |
Contents of Carton |
|
|
|
|
| |
• | One Snow Thrower | • | Replacement Auger Shear Pins | • | One Chute Control Rod | |
• | One Chute Assembly | • | One Product Registration Card | • | One Snow Thrower Operator’s | |
|
|
|
|
| Manual |
•One Engine Operator’s Manual
Assembly
Handle
1.Place the shift lever in the
2.Observe the lower rear area of the snow thrower to be sure both cables are aligned with roller guides before pivoting the handle upward. See Figure
NOTE: Make certain the cables are seated properly in the roller guides. See Figure
Figure
3.Secure the handle by tightening the plastic knob located on both the left and right sides of the handle. Remove and discard any rubber bands, if present. They are for packaging purposes only.
Figure
7