3.Finish securing chute control assembly to chute support bracket with wing nut and hex screw removed earlier.

See Fig. 3-4.

Figure 3-4

Set-Up

Shear Pins

A pair of replacement auger shear pins and bow tie cotter pins are included with your snow thrower. Store them in your snow thrower’s dash panel until needed. See Fig. 3-6.

4.

Check that all cables are properly routed through the cable

Figure 3-6

 

guide on top of the engine. See Fig. 3-5.

Chute Clean-Out Tool

The chute clean-out tool is fastened to the top of the auger housing with a mounting clip and a cable tie at the factory. Cut the cable tie before operating the snow thrower. See Fig. 3-7.

Chute Clean-out Tool

Figure 3-5

Figure 3-7

8Section 3— Assembly & Set-Up