True Food Service Equipment, Inc.
INSTALLATION / OPERATION INSTRUCTIONS
INSTALLATION OF CASTORS
IMPORTANT SAFEGUARD FOR INSTALLATION OF LEG/CASTOR (IMAGES
Step 3
Securing Castors
To obtain maximum strength and stability of the unit, it is important that you make sure each castor is secure. The bearing race on the castor of the top edge of the leg must make firm contact with the rail.
Unit leveling
Four leveling shims have been provided for leveling castored units positioned on uneven floors. Shims must be positioned between rail end and bearing race. True recommends a four shim limit to any single castor.
A.Turn the bearing race
B.Install the desired number of shims, making sure the
slot of the shim is in contact with the threaded stem of the castor.
C.If more than one shim is used, turn the slot at a 90° angle so they are not in line.
D.Turn the bearing race clockwise to tighten and secure the castor by tightening the anchoring bolt with a 3/4 inch
CAUTION
To avoid damage to lower rail assembly, slowly raise
unit to upright position.
1
Thread castor into the underside of cabinet frame rail.
2
For leveling, insert the shim between the castor and frame rail.
Lower Rail Assembly
Rail End
Snug Fit
Here
Bearing
Race
Leveling Shim
Castor
3
Use the tool provided to tighten the castor into place.
5 | www.truemfg.com | 5 |