6

CEILING

36"

Minimum

8" Minimum

From Sides Of

Heater

Right

LeftSide

Side

3" Minimum To Top Surface

Of Carpeting, Tile Or Other

Combustible Material

FLOOR

Figure 2 - Mounting Clearances As Viewed From Front of Heater

INSTALLING HEATER TO WALL

Marking Screw Locations

1. Determine where you will locate heater.

!WARNING

Maintain minimum clearances shown in Figure 3. If you can, provide greater clearances from floor and joining wall.

2. Mark two mounting screw locations on wall (see Figure 3).

10 7/8" 7 3/4"

Minimum To

Maintain 8"

Clearance

From Wall

WALL

Mounting

20 1/4"

Screw

Minimum To

 

JOINING

Locations

Maintain 3"

 

Clearance

 

 

 

 

From Floor

FLOOR

Figure 3 - Mounting Screw Locations

Page 6
Image 6
Vanguard Heating VN6A, VN12 installation manual Installing Heater to Wall, Ceiling, Floor, Marking Screw Locations