®

BHDV34NB AND BHDV34PB

DIRECT-VENT FIREPLACE (NATURAL/PROPANE/LP)

VENTING INSTALLATION

Continued

INSTALLATION FOR HORIZONTAL TERMINATION

1.Determine the route your horizontal venting will take. Note: The location of the horizontal vent termination on the exterior wall must meet all local and national building codes and must not be easily blocked or obstructed.

WARNING: Do not recess vent terminal into a wall or siding.

Snorkel terminations are available for terminations requiring a vertical rise on the exterior of the building (see Figures 9 and 10). Snorkel kit SVK is also avail- able (see page 15). Follow the same in- stallation procedures used for standard horizontal terminations. If installing the snorkel termination below grade (base- ment applications), you must provide proper drainage to prevent water from entering the snorkel termination (see Figure 10). Do not back fill around the snorkel termination.

2.Rigid vent pipes and fittings have spe- cial twist-lock connections. Assemble the desired combination of pipe and el- bows to the appliance adaptor with pipe seams oriented towards the wall or floor.

Twist-lock Procedure: The female ends of the pipes and fittings have four locking lugs (indentations). These lugs will slide straight into matching slots on the male ends of adjacent pipes and fit- tings. (All connections must be sealed with high temperature silicone sealant as specified in the second warning state- ment on page 7.) Push the pipe sections together and twist one section clockwise approximately one-quarter turn until the sections are fully locked. See Figure 11, page 9. Note: Horizontal runs of vent must be supported every three feet. Use wall straps for this purpose.

Flexible vent pipe must be installed with spacer springs every 12". See Figure 11, page 9. All connections must be clamped tightly and sealed with high temperature silicone sealant as specified in the sec- ond warning statement on page 7.

Snorkel

12" Minimum

To Ground Level

Figure 9 - Snorkel Termination

Snorkel

12" Minimum

To Ground Level

Adequate drainage

Figure 10 - Snorkel Termination with Drainage Pipe

8

106516

Page 8
Image 8
Vanguard Managed Solutions BHDV34PB installation manual Installation for Horizontal Termination, Snorkel Termination