STEP 5

Assemble the extension pipe + pressure regulator group to the range manifold interposing the gasket supplied. The regulator cover must be ordiented toward the front side of the range.

IMPORTANT: use two spanners to tighten the connection.

Fig. 2.2e

16

STEP 6

Fix the “C” bracket on the back of the range by the 2 (two) screws supplied with the kit for gas connection.

The regulator cover must be ordiented toward the front side of the range.

C

Fig. 2.2f

Page 16
Image 16
Verona VEFSGE 365 ND manual