Manuals
/
Verona
/
Kitchen Appliance
/
Double Oven
Verona
VEFSGG 365 ND
warranty
Models:
VEFSGG 365 ND
1
27
28
28
Download
28 pages
6.22 Kb
21
22
23
24
25
26
27
28
Install
Wiring Diagram
Fitting the Adjustable Feet
Setting the Burner Minimum
Leak Testing
Replacement Parts
Page 27
Image 27
27
Page 26
Page 28
Page 27
Image 27
Page 26
Page 28
Contents
Double Oven GAS Range
ALL Ranges can TIP
DATA PLATE Conversion Label
Installation Instructions
Electrical Grounding Instructions
Replacement Parts
Proximity to Side Cabinets
installation
GAS and Electric Connection
Oven
305
Fitting the Adjustable Feet
Levelling the Cooker
Moving the Cooker
Backguard or the island trim
It is mandatory to install
ASSEMBLING THE BACKGUARD
OR THE ISLAND TRIM
28 15/16 735 mm
Manual Shut-off Valve .1
Explosion Hazard
Pressure Regulator
Lock
Pressure Regulator Installation
Important use two spanners to tighten the connection
Page
Range Manifold Manifold male Pipe fitting
Leak Testing
Flexible Connections
Rigid Pipe Connections
CONVERSION TO LP/PROPANE GAS
SETTING THE PRESSURE REGULATOR .5
INJECTORS TABLE
Operations to be Performed When Substituting Injectors
Semirapid and triple ring burners
Setting the Burner Minimum
Oven Burner
LEFT and RIGHT OVEN
Adjustment of the Oven Burner Minimum
Recommended ground method
Electrical connection
Wiring Diagram
Page
Page
Cod ß1
Top
Page
Image
Contents