Vulcan-Hart EF5 ML-114944, EF4 ML-114943 Installation, Operation and Care of, Unpacking

Models: EF3 ML-52099 EF4 ML-114943 EF5 ML-114944

1 12
Download 12 pages 55.28 Kb
Page 3
Image 3
Installation, Operation and Care of

Installation, Operation and Care of

MODELS EF3, EF4 & EF5 ECONOFRY GAS FRYERS

KEEP THESE INSTRUCTIONS FOR FUTURE USE

GENERAL

Your Vulcan-Hart Gas Fryer is produced with quality workmanship and material. Proper installation, usage and maintenance will result in many years of satisfactory performance.

It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.

INSTALLATION

Before installing the fryer, verify that the type of gas (natural or propane) agrees with the specifications on the fryer data plate which is located on the inside of the door. Also be sure the fryer is built for the installation elevation.

The fryer must be restrained with adequate ties to prevent tipping when installed in order to avoid the splashing of hot liquid.

UNPACKING

This fryer was carefully inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking the fryer, check for possible shipping damage. If the fryer is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.

Accessories packed in the fry tank include:

 

Crumb Screen

Drain Pipe

Basket Hanger

(2) Twin Fry Baskets

(4) Legs

 

Do not use the door or its handle to lift or move the fryer.

— 3 —

Page 3
Image 3
Vulcan-Hart EF5 ML-114944 Installation, Operation and Care of, MODELS EF3, EF4 & EF5 ECONOFRY GAS FRYERS, Unpacking