Installation, Operation and Care of

MODEL MG24CB MEDIUM DUTY GAS CHARBROILER

COUNTERTOP MODEL

PLEASE KEEP THIS MANUAL FOR FUTURE USE

GENERAL

Vulcan charbroilers are produced with quality workmanship and material. Proper installation, usage and maintenance of your charbroiler will result in many years of satisfactory performance.

It is suggested that you thoroughly read this entire manual and carefully follow all of the instructions provided.

INSTALLATION

Before installing, verify that the type of gas supply (natural or propane) agrees with the specifications on the rating plate located on the left-hand body side. If the supply and equipment requirements do not agree, do not proceed with the installation. Contact your dealer or Vulcan Company immediately.

UNPACKING

This charbroiler was inspected before leaving the factory. The transportation company assumes full responsibility for safe delivery upon acceptance of the shipment. Immediately after unpacking, check for possible shipping damage. If the charbroiler is found to be damaged, save the packaging material and contact the carrier within 15 days of delivery.

Remove the packing bag containing the adjustable legs. Carefully unpack the charbroiler and place it in a work-accessible area as near to its final installed position as possible. Lift the grates and radiants out of the carton.

LOCATION

The equipment area must be kept free and clear of combustible substances.

The charbroiler must be installed only in fire resistant locations.

— 4 —

Page 4
Image 4
Vulcan-Hart ML-114634, MG24CB operation manual Installation, Unpacking, Location