Vulcan-Hart VCRH12 operation manual Operation, Controls, Lighting Instructions, Pilots

Models: VCRH12

1 20
Download 20 pages 45.5 Kb
Page 7
Image 7
OPERATION

OPERATION

CONTROLS The hotplate and its parts are hot. Use care when operating, cleaning or servicing the hotplate.

CONTROLS

There is one pilot for every two burners. The hotplate is equipped with standing, unmonitored pilots. Gas will flow from the pilots as soon as the main gas supply to the unit is turned on. See pilot lighting procedure below.

Each burner is independently controlled by an infinite heat control valve. Once the pilots are lit, turning the control knob to the ON position will light each burner. The burners will be in the full ON position when the control knobs are turned all the way to the left. The burners will be in the full OFF position when the control knobs are turned all the way to the right. See Fig 4.

OFF

Fig. 4

ON

CONTROL KNOBSLIGHTING INSTRUCTIONS

LIGHTING INSTRUCTIONS

1.See Fig 5. Turn main gas shut-off valve and all burner control knobs to the OFF position and wait 5 minutes to allow any accumulated gas to escape.

2.Remove the front row of grates.

3.Turn main gas shut-off valve ON. Light the pilot between each two main burners. Pilot can be accessed under the grate support beam running from left to right. Adjust the pilot valve screw(See Fig.6 on page 8) until the pilot flame has a slight yellow tip.

4.To light burners, turn individual burner valves to the ON position.

Fig. 5

5.If burners fail to light, turn all valves and the main gas shut-off to the OFF position and contact an authorized service agency.

PILOTS

- 7 -

Page 7
Image 7
Vulcan-Hart VCRH12 operation manual Operation, Controls, Lighting Instructions, Pilots