Reinstall control panel (after checking for gas leaks)

(1)Set the control panel in place over both sides of the frame. Hold the crossover ignition button up while setting the control panel in place.

(2)Line up the control panel with the white plastic plugs in the frame brace. Insert screws and tighten with a Phillips screwdriver until snug. Do not overtighten.

(3)Push each of the burner control knobs onto their valve.

(4)Reinstall Side Burner cover.

(1)

(3)

(2)

Install Right Work Surface

You will need right work surface, two 1/2 inch bolts, two nylon washers and a 7/16 inch or adjustable wrench.

Insert the right work surface tabs in the slots In the frame(1). Slip washers on the bolts and insert the bolts as shown(2). Tighten

(1)(2)

C-4

Page 16
Image 16
Weber Genesis Gold B manual Reinstall control panel after checking for gas leaks, Install Right Work Surface