
3.Attach an Upright (1) to each Base (7) using four Joint Plates (12), eight M10 x 80mm Bolts (41), and eight M10 Nylon Locknuts (11). Make sure the Uprights are oriented exactly as shown. Do not tighten the Nylon Locknuts yet.
4.Insert a Weight Guide (18) into the indicated hole in each Base (7). Attach the Weight Guides to the Bases using two M10 x 75mm Bolts (39), four M10 Small Washers (6), and two M10 Nylon Locknuts (11). Do not tighten the Nylon
Locknuts yet.
5.Press a 25mm Bushing (48) into each end of the Locking Bar (34). Slide the Barbell (35) into the Locking Bar.
| 3 | 
 | 
 | 
| 1 | 
 | 
 | 
| 41 | 
 | 
 | 
| 7 | 1 | 
 | 
| 12 | 
 | 
 | 
| 
 | 
 | 7 | 
| 12 | 
 | 
 | 
| 
 | 11 | 
 | 
| 
 | 12 | 
 | 
| 
 | 12 | 41 | 
| 
 | 
 | |
| 4 | 
 | 
 | 
| 18 | 
 | 
 | 
| 39 | 
 | 
 | 
| 6 | 7 | 
 | 
| 
 | 
 | |
| 6 | 
 | 
 | 
| 11 | 18 | 
 | 
| 
 | 
 | |
| 
 | 11 | 39 | 
| 
 | 6 | |
| 
 | 
 | |
| 
 | 7 | 6 | 
| 
 | 
 | |
| 5 | 
 | 
 | 
| 48 | 34 | 
 | 
| 
 | 
 | 35 | 
| 
 | 48 | 
 | 
6
