4.Press a 2Ó Square Inner Cap (17) into each end of the Front Stabilizer (37).

Insert two M10 x 62mm Carriage Bolts (33) through the holes in the Front Stabilizer (37). Note: On one side of the Stabilizer there is an indentation around the holes. Insert the Bolts from this side.

Place the Stabilizer flat on the floor.

Place the Front Leg (19) over the two M10 x 62mm Carriage Bolts (33) in the Front Stabilizer (37). Secure the Front Leg with two M10 Nylon Locknuts (11). Do not tighten the Nylon Locknuts yet.

5.Insert two M10 x 68mm Bolts (34) through the indicat- ed bracket on the Bench Frame (5) and then through the holes in the Front Leg (19).

Secure the upper of the two M10 x 68mm Bolts (34) with an M10 Nylon Locknut (11).

Secure the lower of the two M10 x 68mm Bolts (34) with an M10 Washer (6) and an M10 Nylon Locknut (11). Do not tighten the Nylon Locknuts yet.

6.Slide an M10 Washer (6) onto each of two M10 x 68mm Bolts (34). Slide the Bolts through the indicated holes in the Crossbar (20).

Slide the bracket on the Bench Frame (5) onto the two M10 x 68mm Bolts (34) in the Crossbar (20). Secure the Bench Frame with two M10 Nylon Locknuts (11). Go back and tighten all M10 Nylon

Locknuts used in steps 1 through 6.

7.Press a 45mm x 45mm Square Inner Cap (24) into each end of the Leg lever (18).

Attach the Weight Tube (39) to the Leg Lever (18) with an M8 x 58mm Bolt (43), two M8 Washers (23), the Leg Lever Spacer (50) and an M8 Nylon Locknut (13).

4

 

 

 

19

 

11

 

 

 

11

 

17

 

 

37

 

 

 

17

 

33

 

 

5

34

 

 

5

 

 

34

 

11

 

 

6

 

 

19

 

 

6

 

 

11

6

34

11

20

 

5

 

 

7

24

 

 

 

18

 

 

24

23

 

13

 

 

50

23

 

39

 

 

24

 

43

 

 

8

Page 8
Image 8
Weider WEBE07790 manual Locknuts used in steps 1 through