36.Wrap the Leg Lever Cable (51) under a 90mm Pulley (48). Attach the Pulley to the Right Press Arm (16) with an M10 x 50mm Bolt (97), two Half Guards (55), a Cable Trap (56), an M10 Washer (80), and an M10 Nylon Locknut (77). Make sure the Cable Trap and Half Guards are oriented as shown.

37.Wrap the Leg Lever Cable (51) around a “V”-pul- ley (47). Attach the Pulley to the Upright (2) with an M10 x 70mm Bolt (113), two Half Guards (55), an M10 Washer (80), a Long Cable Trap (57), and an M10 Nylon Locknut (77). Make sure the

Cable Trap and Half Guards are oriented as shown.

38.Wrap the Leg Lever Cable (51) around a 90mm Pulley (48). Attach the Pulley to the Left Press Arm (15) with an M10 x 50mm Bolt (97), two Half Guards (55), an M10 Washer (80), and a Cable Trap (56). Make sure the Cable Trap and Half

Guards are oriented as shown.

36

 

 

 

55

 

51

 

 

80

 

77

 

55 97

 

48

 

 

 

56

16

 

 

37

 

2

 

55

 

57

77

 

47

 

 

 

 

 

80

 

 

55

 

 

 

 

51

 

 

 

 

113

 

38

 

 

 

 

97

 

 

 

 

51

15

 

 

48

 

 

 

55 80

 

 

 

56

77

 

 

55

21

Page 21
Image 21
Weider WESY2916.0 user manual Cable Trap and Half Guards are oriented as shown