19.Attach a Bumper (40) to the Press Front Leg (20) with a 1” Tap Screw (80).

Press a 2” x 3” Inner Cap (78) into the top of the Press Leg Lever (90).

Lubricate a 1/2” x 4” Bolt (68). Attach the Press Leg Lever (90) to the Press Base (6) with the Bolt and a 1/2” Nylon Jamnut (36). Note: Do not over tighten the Nylon Jamnut; the Press Leg Lever must be able to pivot easily.

20.Insert two 2” Square Inner Caps (28) into the Leg Lever (41).

Attach a Bumper (40) to the Butterfly Front Leg (3) with a 1” Tap Screw (80).

Lubricate a 3/8” x 3” Bolt (88). Attach the Leg Lever (41), with the small slot on the side shown, to the Butterfly Front Leg (3) with the Bolt and a 3/8” Nylon Jamnut (63). Note: Do not over tighten the

Nylon Jamnut; the Leg Lever must pivot easily.

CABLE ASSEMBLY

21.

IMPORTANT: While assembling the cables, do not over tighten the bolts and nuts attaching the pulleys. The pulleys must be able to turn freely. Refer to the Cable ID Chart on page 26 for help identifying the cables.

Locate and open the parts bags labeled “CABLE ASSEMBLY” and “PULLEYS.”

Locate the Butterfly Cable (73), which is the shorter cable of the two that have eyelets on both ends. Attach the Butterfly Cable (73) to the Right Pivot Arm (85) with a 5/16” x 2 1/4” Shoulder Bolt (79) and a 5/16” Nylon Jamnut (34).

22.Wrap the Butterfly Cable (73) over a “V”-Pulley

(27).Attach the “V”-Pulley and a Large Cable Trap

(32)to the bracket on the Butterfly Upright (1) with a 3/8” x 2 1/2” Bolt (87) and a 3/8” Nylon Locknut

11

19

78

 

 

 

 

 

 

90

 

 

 

40

 

 

 

 

20

 

68

80

 

 

Lubricate

36

6

 

 

 

 

20

Lubricate

 

88

 

 

 

 

 

28

 

63

 

41

 

 

 

 

 

 

Small

 

40

 

Slot

 

 

80

28

 

 

 

 

3

 

 

21

 

 

 

 

79

 

 

73

 

85

 

34

 

 

 

 

 

22

 

 

 

 

 

50

 

87

32

 

 

 

 

 

 

27

 

 

 

73

1

 

 

 

 

Page 11
Image 11
Weider WESY37531 user manual Cable Assembly, Nylon Jamnut the Leg Lever must pivot easily