48. Wrap the Squat Cable (73) under a 3 1/2” Pulley

48

 

(78). Attach the Pulley and a Cable Trap to the sec-

 

 

 

ond set of holes from the top in the indicated brack-

 

 

et on the Long Base (120) with a 3/8” x 2” Bolt

 

 

(100) and a 3/8” Nylon Locknut (87).

 

68

 

 

 

73

 

 

 

87

 

 

78

 

100

120

49. Wrap the Squat Cable (73) over a 4 1/2” Pulley

49

 

(119). Attach the Pulley to the indicated bracket on

6 87

 

the Top Frame (6) with a 3/8” x 1 3/4” Bolt (93) and

 

 

a 3/8” Nylon Locknut (87).

 

 

 

93

 

 

 

119

 

 

73

50. Place a 1/2” Washer (1) on top of the Weight Tube

50

 

 

(43) closest to the Squat Upright (4). Tighten a 1/2”

 

 

 

 

 

Nut (118) halfway onto the end of the Squat Cable

 

 

4

(73).

 

 

 

 

73

 

 

 

Lift the Weight Tube (43) and the Top Weight (45)

 

 

 

and make sure that the small pin on the Weight

 

 

118

Tube is inside of the groove under the Top Weight.

 

 

1

 

 

 

Hold the Weight Tube (43) and the Top Weight (45)

 

 

45

 

 

 

a few inches over the weight stack while you screw

 

 

43

the end of the Cable (73) two full turns into the

 

 

Weight Tube. Then, tighten the Nut against the 1/2”

 

 

 

Washer (1).

 

 

 

SEAT ASSEMBLY

51

19

 

 

 

 

109

 

23

51. Locate and open the parts bag labeled “SEAT

 

 

 

 

9 19

ASSEMBLY.”

 

 

Insert the Pad Tube (23) into the square hole in the

 

 

 

Seat Upright (9). Slide the two Knee Pads (19) onto

 

 

 

the Pad Tube as shown. Press the two Knee Pad

 

 

 

Caps (109) into the ends of the Pad Tube.

 

20

109

 

 

 

 

 

Slide two Short Pads (20) onto the Leg Lever (10).

 

 

10

 

 

 

 

 

 

20

19

Page 19
Image 19
Weider WESY38322 user manual Locate and open the parts bag labeled Seat, Assembly