Boiler manual: • Installation •
Complete block assembly
DO NOT insert a bottom
3.To remove flue
Install cleanout plates
Cleanout plates must be installed
1.See Figure 13.
2.Position two ¼" x 1¾" carriage bolts in cleanout opening, be- tween the cleanout plate bosses, as shown. Secure with washers and nuts.
3.Place woven fiberglass gasket over carriage bolts.
4.Mount cleanout plate over opening. Secure with nuts and wash- ers.
5.Repeat steps 1 through 3 for remaining cleanout plates.
(continued)
Figure 13 Cleanout plate assembly
Install draft hood collar
1.Install 1/8" continuous bead of sealing rope adhesive in groove on draft hood collar.
2.Position ½" sealing rope in groove. Overlap ends of rope at least 1 inch.
3.Mount collar over flueway outlet on back section. Secure with ½ x 1½" hex head cap screws and washers.
Part No.
The boiler contains ceramic fiber and fiberglass materials. Use care when han- dling these materials per instructions on page 34 of this manual. Failure to comply could result in severe personal injury.
13