Weil-McLain 88 manual Before installing boiler, Installation must comply with

Models: 88

1 40
Download 40 pages 12.21 Kb
Page 4
Image 4
Before installing boiler

Weil-McLain 88 Water and steam boilers — Series 2 — for Gas, Light Oil, & Gas/Light Oil-Fired Burners

Before installing boiler

Installation must comply with —

1.State, provincial and local plumbing, heating and electrical codes.

2.Regulations of servicing utilities.

3.ASME Section IV, Low Pressure Boiler and Pressure Vessel Code.

4.National Fuel Gas Code, ANSI/NFPA 54, when applicable.

5.National codes where applicable.

Before selecting boiler location

1.Check for nearby connections to:

a.Fuel supply.

b.Electrical power.

c.System water or steam piping.

d.Venting systems - see page 29.

e.Combustion and ventilation air supply — see page 5.

2.Check area around boiler. Remove any combustible materials, gasoline and other flammable vapors and liquids.

Failure to keep boiler area clear and free of combustible materials, gasoline and other flammable liquids and vapors can result in severe personal injury, death and substantial property damage.

Provide clearance around boiler

1.Provide minimum clearances to combustible materials:

Boiler top — 24 inches.

Boiler front — 48 inches.

Boiler flue — 9 inches.

Boiler rear — 9 inches.

Boiler sides — 6 inches.

Single-wall vent pipe – 18 inches.

Double-wall vent pipe – refer to vent pipe manufacturer's recommendations for vent pipe clearances.

2.Boiler may be installed on combustible flooring.

3.See page 36 for boiler dimensions.

Flue pipe/breeching clearances take precedence over jacket clearances.

4.Provide minimum clearances for servicing:

Left side — for cleaning and tankless heater removal – 39 inches.

Rear — for breeching — 36 inches.

Allow sufficient space on remaining sides for cleaning, servicing and burner installation. See burner literature for length and recommended service clearances.

Lay a foundation, if needed

1.Floor construction and condition must be suitable for weight of boiler when filled with water. See page 36 for approximate boiler operating weight.

2.A level concrete or brick foundation, constructed per Figure 1 and Figure 2 is required when:

a.A floor could possibly become flooded.

b.Non-level conditions exist.

4

Figure 1 Boiler foundation, when required

Figure 2 Boiler foundation (see Figure 1)

Boiler model

Length, L, minimum

number

(inches)

 

 

488

33

 

 

588

41

 

 

688

49

 

 

788

57

 

 

888

65

 

 

988

73

 

 

1088

81

 

 

1188

89

 

 

1288

97

 

 

1388

105

 

 

1488

113

 

 

1588

121

 

 

1688

129

 

 

1788

137

 

 

1888

145

 

 

Part No. 550-100-068/0308

Page 4
Image 4
Weil-McLain 88 manual Before installing boiler, Installation must comply with, Before selecting boiler location