GOLD CGi Gas-Fired Water Boiler — Boiler Manual

10b Service & maintenance – annual start-up (cont.)

Safety relief valves should be reinspected AT LEAST ONCE EVERYTHREEYEARS, by a licensed plumb- ing contractor or authorized inspection agency, to ensure that the product has not been affected by corrosive water conditions and to ensure that the valve and discharge line have not been altered or tampered with illegally. Certain naturally occurring conditions may corrode the valve or its compo- nents over time, rendering the valve inoperative. Such conditions are not detectable unless the valve and its components are physically removed and inspected. This inspection must only be conducted by a plumbing contractor or authorized inspection agency — not by the owner. Failure to reinspect the boiler relief valve as directed could result in unsafe pressure buildup, which can result in severe personal injury, death or substantial property damage.

Following installation, the valve lever must be operated AT LEAST ONCE AYEAR to ensure that waterways are clear. Certain naturally occurring mineral deposits may adhere to the valve, rendering it inoperative. When manually operating the lever, water will discharge and precautions must be taken to avoid contact with hot water and to avoid water damage. Before operating lever, check to see that a discharge line is connected to this valve directing the flow of hot water from the valve to a proper place of disposal otherwise severe personal injury may result. If no water flows, valve is inoperative. Shut down boiler until a new relief valve has been installed.

Review with owner

1.Review the User’s Information Manual with the owner.

2.Emphasize the need to perform the maintenance schedule specified in the User’s Information Manual (and in this manual as well).

3.Remind the owner of the need to call in a licensed contractor should the boiler or system exhibit any unusual behavior.

4.Remind the owner to follow the proper shutdown procedure and to schedule an annual start-up at the beginning of the next heating season.

Cleaning boiler heating surfaces

The boiler contains ceramic fiber and fiberglass materials. Use care when handling these materials per instructions on page 68 of this manual. Failure to comply could result in severe personal injury.

1.Shut down boiler:

Follow “To Turn Off Gas to Appliance” instructions on boiler and Operating instructions.

Do not drain boiler unless it will be exposed to freezing temperatures. If using antifreeze in sys-

tem, do not drain.

Boiler relief valve

1.Inspect the relief valve and lift the lever to verify flow as in the following warnings, excerpted from a relief valve manufacturer’s warning label. Before operating any relief valve, ensure that it is piped with its discharge in a safe area to avoid severe scald potential. Read manual Section 4 before proceeding further.

2.After following the above warning directions, if the relief valve weeps or will not seat properly, replace the relief valve. Ensure that the reason for relief valve weeping is the valve and not over-pres- surization of the system due to expansion tank waterlogging or undersizing.

Figure 35 Relief valve, typical

2.Follow shutdown procedure.

3.Remove venting system connection to boiler.

4.Remove top jacket panel. Turn back insulation.

5.Remove collector box/transition assembly. Clean sealant from assembly and sections.

6.Remove radiation plates hanging between sections.

7.Remove burners from base. Brush and vacuum burners to remove all dust and lint. Verify that all burner ports are free of debris.

8.Place newspapers in base of boiler to collect soot.

9.Clean between sections with wire flue brush.

10.Remove newspaper and soot. Vacuum or brush base and surrounding area.

11.Reinstall radiation plates.

12.Replace collector box/transition assembly. Seal with seal- ant. Obtain gas-tight seal to prevent flue gas spillage and carbon monoxide emissions, resulting in severe personal injury or death.

13.Replace insulation and jacket top panel.

14.Start up boiler following Section 7, pages 32-35 of this manual and the boiler Operating instructions. Excessive sooting indicates improper gas combustion. If found check for proper combustion and make any necessary adjustments.

Part Number 550-110-710/0107

47

 

Page 47
Image 47
Weil-McLain Series 2 manual Review with owner, Boiler relief valve

Series 2 specifications

The Weil-McLain Series 2 is a highly regarded boiler system known for its robustness, efficiency, and ease of installation. Designed primarily for residential and light commercial applications, the Series 2 boasts a variety of features that cater to diverse heating needs.

One of the standout characteristics of the Series 2 is its cast iron construction, which provides durability and longevity. Cast iron is well-suited for heat retention, allowing the boiler to operate more efficiently and deliver consistent warmth. The Series 2 is available in multi-fuel options, accommodating both natural gas and propane, making it versatile for various installations.

Efficiency is a key feature of the Weil-McLain Series 2, with annual fuel utilization efficiency (AFUE) ratings that meet or exceed industry standards. This ensures that homeowners can enjoy not only a comfortable living environment but also reduced energy bills. The Series 2 is designed to provide optimal performance, minimizing fuel consumption while maximizing heat output.

Another innovative aspect of the Series 2 is its user-friendly control system. Equipped with advanced controls, the boiler allows for precise temperature management and can easily be integrated with existing heating systems. This adaptability is crucial for ensuring that the boiler matches the specific heating demands of any space, increasing overall comfort levels.

Installation is straightforward, thanks to the boiler's thoughtful design. The Series 2 features a compact footprint, allowing for flexible placement in various settings. Additionally, Weil-McLain provides comprehensive documentation and customer support, making it easier for technicians to install and maintain the system.

The Series 2 also includes features aimed at ease of maintenance. Its clean-out ports facilitate quick access for servicing, ensuring that the boiler remains in peak operating condition throughout its lifespan. Weil-McLain’s commitment to quality means users can expect reliable performance year after year.

Overall, the Weil-McLain Series 2 stands out as an excellent choice for those seeking a dependable, efficient, and straightforward heating solution. Its combination of durable construction, high efficiency, and user-centric design makes it a leading option in the boiler market, appealing to both homeowners and professionals alike. Whether for a new installation or a replacement, the Series 2 is poised to deliver exceptional heating performance.