GOLD CGi Gas-Fired Water Boiler — Boiler Manual

1c Prepare boiler location — vent system

Failure to follow all instructions can result in flue gas spillage and carbon monoxide emissions, causing severe personal injury or death.

Inspect existing chimney before installing boiler. Failure to clean or replace perforated pipe or tile lining will cause severe personal injury or death.

Direct exhaust venting (Category III) — Do not common vent the CGi in a direct exhaust system (Category III). Connecting more than one appliance to a direct exhaust system will cause flue gas spillage or appliance malfunc- tion, resulting in possible severe personal injury, death or substantial property damage.

When removing boiler from an existing common vent system:

At the time of removal of an existing boiler, the following steps shall be followed with each appliance remaining con- nected to the common venting system placed in operation, while the other appliances remaining connected to the common venting system are not in operation.

a.Seal any unused openings in the common venting system.

b.Visually inspect the venting system for proper size and horizontal pitch and determine there is no blockage or restriction, leakage, corrosion or other deficiencies which could cause an unsafe condition.

c.Test vent system — Insofar as is practical, close all building doors and windows and all doors between the space in which the appliances remaining connected to the common venting system are located and other spaces of the building. Turn on clothes dryers and any appliance not connected to the common venting system. Turn on any exhaust fans, such as range hoods and bathroom exhausts, so they will operate at maximum speed. Do not operate a summer exhaust fan. Close fireplace dampers.

d.Place in operation the appliance being inspected. Follow the lighting/operating instructions. Adjust thermostat so appliance will operate continuously.

e.Test for spillage at draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle.

f.After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous con- ditions of use.

Any improper operation of common venting system should be corrected so the installation conforms with the National Fuel Gas Code, ANSI Z223.1-latest edition. Correct by re- sizing to approach the minimum size as determined using the appropriate tables in Part 11 of that code. Canadian installations must comply with B149.1 or B149.2 Instal- lation Code.

Chimney or vent require- ments

1.Venting must be installed according to Part 7, Venting of Equipment, of National Fuel Gas Code, ANSI Z223.1-latest edition and appli- cable building codes. Canadian installations must comply with B149.1 or B149.2 Installation Codes.

2.See Ratings table on page 67 for minimum chim- ney or vent sizes. A chimney or vent without a listed cap should extend at least 3 feet above the highest point where it passes through a roof of a building and at least 2 feet higher than any portion of a building within a horizontal distance of 10 feet. A chimney or vent must not extend less than the distances stated above.

3.A lined chimney is preferred and must be used when required by local, state, provincial and national codes, laws, regulations and ordinances. Vitreous tile linings with joints that prevent retention of moisture and linings made of non- corrosive materials are best. Advice for flue con- nections and chimney linings can be obtained from local gas utility. Type B double-wall metal vent pipe or single-wall vent pipe may be used as a liner.

4.Cold masonry chimneys, also known as outside chimneys, typically have one or more walls ex- posed to outside air. When any atmospheric gas-fired boiler with automatic vent damper is vented through this type of chimney, the potential exists for condensation to occur. Con- densation can damage a masonry chimney. Weil- McLain recommends the following to prevent possible damage.

a.Line chimney with corrosion-resistant metal liner such as AL29-4C® single-wall stainless steel or B-vent. Size liner per Na- tional Fuel Gas Code ANSI Z223.1-latest edition.

b.Provide drain trap to remove any conden- sate.

Part Number 550-110-710/0107

Page 8
Image 8
Weil-McLain Series 2 1c Prepare boiler location vent system, When removing boiler from an existing common vent system

Series 2 specifications

The Weil-McLain Series 2 is a highly regarded boiler system known for its robustness, efficiency, and ease of installation. Designed primarily for residential and light commercial applications, the Series 2 boasts a variety of features that cater to diverse heating needs.

One of the standout characteristics of the Series 2 is its cast iron construction, which provides durability and longevity. Cast iron is well-suited for heat retention, allowing the boiler to operate more efficiently and deliver consistent warmth. The Series 2 is available in multi-fuel options, accommodating both natural gas and propane, making it versatile for various installations.

Efficiency is a key feature of the Weil-McLain Series 2, with annual fuel utilization efficiency (AFUE) ratings that meet or exceed industry standards. This ensures that homeowners can enjoy not only a comfortable living environment but also reduced energy bills. The Series 2 is designed to provide optimal performance, minimizing fuel consumption while maximizing heat output.

Another innovative aspect of the Series 2 is its user-friendly control system. Equipped with advanced controls, the boiler allows for precise temperature management and can easily be integrated with existing heating systems. This adaptability is crucial for ensuring that the boiler matches the specific heating demands of any space, increasing overall comfort levels.

Installation is straightforward, thanks to the boiler's thoughtful design. The Series 2 features a compact footprint, allowing for flexible placement in various settings. Additionally, Weil-McLain provides comprehensive documentation and customer support, making it easier for technicians to install and maintain the system.

The Series 2 also includes features aimed at ease of maintenance. Its clean-out ports facilitate quick access for servicing, ensuring that the boiler remains in peak operating condition throughout its lifespan. Weil-McLain’s commitment to quality means users can expect reliable performance year after year.

Overall, the Weil-McLain Series 2 stands out as an excellent choice for those seeking a dependable, efficient, and straightforward heating solution. Its combination of durable construction, high efficiency, and user-centric design makes it a leading option in the boiler market, appealing to both homeowners and professionals alike. Whether for a new installation or a replacement, the Series 2 is poised to deliver exceptional heating performance.