Tools/supplies needed
1.
2.Tape measure
3.Utility knife
4.Socket wrench with %6” (11 mm) and %I” (6 mm) sockets
OR
%I” (6 mm) nut driver
5.Electric drill
6.YY (2 mm) or smaller drill bit
7.Carpenter’s level
For
8. #l 0 x 1” (25 mm) screws [lo]
Parts supplied for installation
A. %” (10 mm) seal strips [5] B. Side mounting brackets [2]
C. #8 x 3/B”(10 mm)
D. Filler board [l]
E. #8 x 1/2”(12.5 mm)
F. Foam seal [l] G. Foam blocks [4]
H. #lO x %” (19 mm)
I.2%” (63.5 mm) seal strip [l]
J.Vertical supports [2]
K.Angled supports [2]
L.3/4”(19 mm)
M.Flat washers [6]
N.Lock washers [6]
0.Nuts [6]
P.Wall rail [l]
Q.Foam window rail seal [l]
R.Window lock bracket [l]
S.Plastic drain cup [l]
Installation parts are supplied for double-
T.